  1. The whole programme at a glance

    • A refined design: a floating top bar with a live badge, bento cards, figures that count up, sparklines, and Pulse, a theme whose colour follows the programme.
    • One global filter for the Dashboard, Activities, the Gantt and the Look-ahead.
    • A WBS treemap, insights by WBS, workfront density and float erosion on the Dashboard.
    • The update scrubber: step through every loaded update and see the Dashboard as it stood.
    • Activities rebuilt as a fast grid, with an inspector, logic traces and Ctrl+K.
    • The Gantt compares each bar with the baseline or the NEC4 Accepted Programme; time risk allowances are hatched.
    • A 3D programme, and time-chainage for linear works.
    • The programme report: the Dashboard on A4 or A3 pages with your narrative.
    • Forensic analysis draws the longest path as a swimlane flow.
    • Saved projects listed once each, with their revisions loaded as earlier updates.
  2. Submissions, earned value the P6 way, and back to P6

    • Earned Value worked out as P6 does, checked against P6's own figures for every technique.
    • Submission review: a contractor's monthly programme checked against last month's, with comments and a recommendation.
    • The contractor library keeps each contractor's submissions and reviews each one as it arrives.
    • Export to P6 as XER or P6 XML, for the P6 version you choose, checked by importing into P6.
  3. NEC4 contract

    • Completion and Key Dates mapped to the activities that achieve them, across every loaded update.
    • Programme submissions and the Project Manager's replies.
    • Early warning, instruction and compensation event registers, with notice clocks and What is due.
    • A compensation event's time impact, from its fragnet.
  4. Earned value by control account, and saved projects

    • An Earned Value tab: EVM by control account, against the baseline.
    • Progress and baseline checks: open work forecast before the data date, 100% complete but not finished, and more.
    • A signed-in user's uploads are kept to reopen, with the project's name, revision, client and notes.
    • Progress Update adds a Resources & cost sheet, with project expenses.
  5. Schedule Health the P6 way, and a new look

    • Schedule Health laid out in the order of P6's Check Schedule, with BEI, missed and late activities.
    • Six themes and a light behind the page, and a new Dashboard headline.
    • The Progress Update workbook opens filled in, with clearer date checks and a status chart.
    • Apply progress checked by importing into P6 25.12, and flags out-of-sequence updates.
  6. Verified on real programmes

    • Insights: every check verified against real programmes, with narrower, more accurate rules.
    • Forensic analysis: every measure verified; P6's own scheduling options are read from the XER.
    • Risk analysis: consistent working-day units, deadline commitments checked, and P6 start dates respected.
    • Baseline & Delay rebuilt, with unstatused work measured at its data date.
    • NEC4 and the activity register judge the programme as it stands now; finished work is never critical.
    • Printing: paper size and orientation chosen in the print dialog.
    • Phone layout: no tab wider than the screen.
  7. Gantt, look-ahead and trend

    • The Gantt rebuilt in P6's layout, with logic tracing.
    • Progress Update: work by responsible person, and a macro-free update workbook.
    • Look-ahead: status colours, a compact printed sheet, a new workbook, and 16 and 32-week windows.
    • Trend & Forecast: like-for-like forecasts, reliability of dates, and milestone trend.
  8. Schedule Health, the DCMA way

    • The DCMA checks now count incomplete work and relationships into open work, as DCMA does.
    • Administration revamped: thresholds, counting basis and scored checks.
  9. Repair XER

    • Out-of-sequence, dangling and redundant logic fixes, each proved on the network and read back before saving.
  10. Risk register, forensic analysis and look-ahead

    • Schedule risk analysis rebuilt around a risk register, with mitigated and unmitigated scenarios.
    • A Forensic Analysis tab.
    • A look-ahead, and CSV and PNG exports.
    • Scheduled dates now match P6's own on real programmes.
  11. A live demo

    • A static demo build, and links straight to any tab.
  12. Ready-to-run packages

    • Double-click Windows and macOS packages that run offline.
    • A deployment that would start without sign-in now fails instead.
  13. Accounts and access

    • An administration panel, with roles and activity-level access control.
  14. First release

    • XER and P6 XML import, the dashboard, earned value, DCMA 14-point assessment and the Excel workbook.