Skip to content
P6 Schedule Analyticsby PlanAssure
Security

How your programme is handled.

A programme can show how a contractor plans to win or defend money. This page says plainly what happens to one when you upload it.

In transit

Every request to the hosted service, including uploads and downloads, travels over HTTPS. TLS is terminated by our hosting provider.

Where it lives

The hosted service runs in the EU (Frankfurt). Uploaded files are stored on disk there, each under a random session identifier, together with the settings you save against them, such as a risk register or NEC4 Contract Data.

To confirm before launchWhether the hosting provider encrypts disks at rest, and a statement of it. Until confirmed, we make no at-rest encryption claim.

How long it's kept

A workspace's projects are kept while it is on a paid plan. When a paid plan ends, they are kept for 30 days and then deleted, and the workspace's owners are emailed at least a week before. A Free workspace's projects are deleted after 30 days without being opened. Owners, admins and members can delete a project at any time.

On a dedicated or on-premise instance, your administrator decides how long uploads are kept, and can delete stored uploads older than a chosen age at any time.

To confirm before launchThis is how the service behaves (decisions D-008 and D-048). Confirm it as policy, and make the terms and privacy notice say the same.

Who can see it

  • Accounts: passwords are stored only as salted scrypt hashes, never in plain text.
  • Roles: viewer, planner and administrator, with each tab and download switched on or off per role, enforced by the server.
  • Activity-level access: a user can be limited to WBS branches or activity-code values. It's enforced on the server for every request, so hidden work can't be reached by calling the API directly.
  • Sign-in controls: sign-in length, password rules, lockout after failed attempts, forced password change, and signing everyone else out.
  • Activity log: sign-ins, failures, account and settings changes, uploads and downloads of repaired files, exportable as CSV.
To confirm before launchWho at our company can access customer data, under what controls, and how access is logged.

What we do with it

We analyse your programme to show you the results. We don't sell it, share it, or use it to train anything. The public demo runs only on a fictional programme we built for the purpose.

Keeping it in-house

Enterprise customers can have a dedicated instance, or install the application on their own servers or a Windows machine, where nothing leaves their network.

GDPR

A programme file usually contains little personal data: typically resource names and activity-code values such as a responsible person's name. Where we process personal data on your behalf, we act as processor and you as controller.

To confirm before launchCompany legal name, registered address and ICO registration; confirm the controller and processor roles with legal review; publish the DPA.

Sub-processors

ProviderPurposeWhereStatus
RenderApplication hosting and storage of uploadsEU (Frankfurt)In use
SupabaseAccounts and the application databaseEU (London or Frankfurt)From launch of accounts
StripePayments, invoices and VATEU and USFrom launch of subscriptions
ResendTransactional emailTo be confirmedFrom launch of accounts
PlausibleCookie-less website analytics, no personal dataEUPlanned, website only

Reporting a vulnerability

If you think you've found a security problem, please tell us before telling anyone else.

To confirm before launchA security contact address (for example security@planassure.co.uk) and a response commitment.