Upload an XER or P6 XML export. Get the DCMA 14-point assessment, earned value and earned schedule, a critical path recomputed from the logic, and every defect with the activities behind it.
Schedule Health
57%
8 of 14
checks pass
Built by a planner for programmes in Rail, Energy and overhead lines, Offshore, Buildings and Civils.
A programme gets scrutinised by the client, the Project Manager and, if it goes wrong, a delay expert. This checks it the way they will, first.
Open ends, leads, lags and hard constraints counted by hand, and counted differently each time.
Each result opens to the activities behind it, with a CSV of the full list. The same rules every period.
A missing access date or no time risk allowance, found by the Project Manager after submission.
Each item passes, fails, or is marked to check by hand with what to look for, so nothing is silently passed.
Stored float from a file that wasn't rescheduled, so half the job reads critical.
Each activity on its own calendar, each lag on its predecessor's, and a warning when the stored dates are stale.
Every module runs on the same export, and every figure below is the real result on our fictional 132 kV overhead line programme at its sixth update.
DCMA 14-point assessment with every offending activity
A critical path recomputed from the logic, in P6's layout
EVM worked out as P6 does, by control account
P80 23 Feb 2027
0% chance of the 18 Dec 2026 Completion Date
Key Dates, submissions, EW · PMI · CE registers, CE impact and clause 31/32 checks
Team planFix defects and write an XER that imports back into P6
9 fix types. An unchanged round trip is byte-identical.
Forecast trend, baseline comparison and windows analysis
A contractor's monthly programme checked against last month's
Rev 6 vs Rev 3 +30 days
to the forecast finish, with every change behind it
25 diagnostic checks, each with evidence and a recommendation
25
checks, each with its evidence
Every activity a block on a 3D timeline


The programme at a glance, and one filter for every tab
Every activity in a fast grid, and the logic around any one of them
2 to 32 weeks of work due, grouped under the WBS
Work by responsible person, and an update workbook to send out
A programme report, Excel workbooks, and a file back to P6
Health, SPI(t), float and top risks across every project, and fragnet-based prospective delay. On the roadmap, not in the product yet.
Measured on a 2,786-activity, 34 MB export: parsed in 4–6 seconds, the full report in under a second more.
File → Export in P6, as XER or P6 XML. Schedule (F9) first so the dates and float are current.
How to export a clean XER →Drop the file in. Load earlier updates or a baseline alongside it to unlock trend and delay analysis.
Schedule Health, the dashboard, the Gantt and every other module, from the same upload. Export what you need.
The 14 DCMA checks, counted the way DCMA counts them: checks 1–10 on incomplete work, and relationships only where the successor is still open. Each check shows its threshold, its result, a gauge against the limit and the activities behind it.


A deeper pass, organised the way a forensic delay analyst reports: an executive scorecard with claims vulnerability, the longest path drawn as a swimlane flow, an anomaly register, root causes and a remediation plan down to P6's scheduling options.


An ECC contract's records kept with the programme: Completion and Key Dates mapped to the activities that achieve them, programme submissions and replies, early warnings, instructions and compensation events with their clocks, a compensation event's time impact, and the clause 31 and 32 checks.


DCMA, Insights and the recomputed critical path on every update.
Review each proposed change and write a corrected XER.
Look-ahead sheets and a workbook per responsible person.
A programme shows how a contractor plans to win or defend money. It's handled accordingly.
Every request to the hosted service travels over HTTPS.
Your programmes are processed and stored in the EU.
Roles and activity-level access, enforced on the server, not just hidden in the page.
Enterprise customers can run a dedicated instance, or install it on their own servers.
Start with a free 1-day trial. Or review a single programme with a 90-day project pass for £149.
Planners and consultants
£32.50per user / month
£390 per user, billed annually
Project controls teams
£99per user / month
£1,188 per user, billed annually · minimum 3 seats
Tier 1 contractors, clients and PMOs
Custom
Quoted for your seats and hosting
Founding customers: the first 50 subscribers keep 30% off for as long as they subscribe.Compare every plan →
Free for a day. Export an XER from P6 and see what it says.