Skip to content
P6 Schedule Analyticsby PlanAssure
Analyse

Schedule risk (QSRA)

Included in: Team and Enterprise plans

A Monte Carlo simulation of the work left: three-point duration uncertainty by WBS branch, activity code or single activity, plus discrete risk events from a register, before and after mitigation.

Finish date confidence: the spread of simulated finish dates with P50 and P80 marked.
Schedule risk (QSRA) · demo programme Rev 6

What it gives you

Checked against known answers

Without sampling, the model reproduces the programme's own finish exactly. Impacts are entered in working days and every gap is reported in working days on the project calendar, with calendar days alongside.

What you set up

  • A default range for every remaining activity, overridden by rules. First match wins.
  • Triangular or BetaPERT distributions.
  • A register with probability, minimum, most likely and maximum impact, linked activities and optional post-mitigation values. CSV in and out.

Check your next update before anyone else does.

Free for a day. Export an XER from P6 and see what it says.