Skip to content
P6 Schedule Analyticsby PlanAssure

The programme in three dimensions: time runs left to right, each WBS area is a street, and the height is the work left or the float. The driving path is a glowing tube you can fly along, and the data date a glass wall.

The 3D programme: every activity a block on a timeline, WBS areas as streets, the data date as a glass wall.
3D programme · demo programme Rev 6

What it gives you

Check your next update before anyone else does.

Free for a day. Export an XER from P6 and see what it says.